Projects

Sao Paulo Subway – Pintsch Bamag

Summary: Dimensional Analysis and support provided to Engineering for the installation of automation equipment for platform access.

Petrobras S/A

Summary: As built 3D utilizing laser scanning of HDT and COQUE units in Gabriel Passos Refinery | Betim | MG. Created and Revised Isometric, Plant and Process Instrumentation Diagrams (PID) documents.
Length of Project: 26 months.

Petrobras S/A

Summary: Adaptation of the technical documentation based on As built with laser scanning of construction. Drafting and revision of the technical documentation.
Length of Project: 18 months.

Petrobras Distribuidora - BR

Summary: Project support of the enlargement of the Lubricant Factory and the construction of the Grease Factory facility. Provided (on-site) Project Support Service which including Piping, Mechanical Engineering, Civil and Structural Engineering, and Electrical Engineering.
Length of project: 6 months.